- Project Involvement
25 years commercial/ heavy industrial/ heavy highway construction
project management.
Kiewit/Bechtel joint
venture. Tacoma Narrows Constructors (2005)
$889M Tacoma Narrows Suspension Bridge. Walls, extensive retrofit
Safety, form design, engineering, production, quality,
Carter & Company
Salem, OR. (2003)
Multi Span Bridge. Abutments, Large scale bridge columns. Scheduling,
safety, form design, engineering, production, materials,.
Ward-Henshaw Construction
Canby, OR. (2002-2003)
Water storage facility and containment tanks. Cast in place seismic
radius walls. Safety, production, positive form design impact,
manpower.
Steelhead Constructors
Inc. San Pedro CA. (2002)
Dam Replacement and retrofit. Coffer dam installation. walls and
gates. Mobilization, safety, materials, form design, coordination,
manpower.
Hoffman Structures
Inc. Portland, OR. (2001-02)
$2 Billion Intel R&D Plant. Fast track operation. Assembly
of forms, cast in place large scale columns operations. Safety,
production, scheduling, coordination, substantially under bid.
Wildish Standard Paving
Co. Eugene, OR. (2001)
Bridge Retrofit and Overlay, Materials, safety, coordination.
public interaction, manpower.
Kiewit Pacific Company
(PacStructures) Vancouver, WA. (2000-01)
fast track. Safety, form design, production, multi level scheduling,
coordination.
Calumet Construction
Corp. (1996-98)
New building construction Notre Dame University. Extensive remodel
of existing buildings. Safety, coordination, form design, logistics,
manpower.
Large office building
construction (1982 – 1996)
Education: Masters
degree in Management